Published on 29 March 2024
1. Cut existing approx 60mm thick concrete path. Two 4.7m long cuts X 145mm apart between cuts (for a future trench drain). Remove and dispose of the resulting 0.68sqm of cut concrete. 2. Cut 1.5m long X 75mm wide X 10mm deep channel/groove in existing concrete path. Cuts to feather to zero at each end of cut, inorder to accommodate the slope and high points of the existing path.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Showed up when he said he would. Was pro-active and understood what need.
Work carried out by the owner/operator
Reviewed on 7 April 2024