Published: 16 June 2014
We have had a new kitchen installed and need to gave the carpet re-stuck down to the edge of the tile bar. Will need a slat of wood with spikes. Also carpet needs to be cut and finished up to the breakfast bar. There are 2 areas that need patching also. One is 250x50mm and the other is 800x250mm. We have off cuts to work with.
#1 | Tradie 1 |
|
82 jobs | No longer in contact |
#2 | Tradie 2 |
|
68 jobs | No longer in contact |
Partner with Builderscrack
Get work