Published: 16 April 2009
FLOORING I have a problem with wood floor around a shower that keeps getting damaged. The job would be to: 1. Lift the damaged wood floor off concrete base, 2. Tile the area around the shower, and 3. Create a watertight joint between the laid tiles and remaining wood floor. (Note that it is not practical to lift the whole floor.) The area is not large, possibly only 2 m2 but will probably require a full day of work to complete.
Workmanship |
5.0
|
Thanks for a good job.
Reviewed on 11-05-2009
Partner with Builderscrack
Get work