Review

Tiling Floor Repair

Job description

Carpet Laying
Wellington

Published: 16 April 2009

FLOORING I have a problem with wood floor around a shower that keeps getting damaged. The job would be to: 1. Lift the damaged wood floor off concrete base, 2. Tile the area around the shower, and 3. Create a watertight joint between the laid tiles and remaining wood floor. (Note that it is not practical to lift the whole floor.) The area is not large, possibly only 2 m2 but will probably require a full day of work to complete.


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo