Published: 25 May 2023
2 room locations: Location 1 - lift carpet, remove section of water damaged floor board (approx L3500mm x W600mm. Replace with treated structural flooring plyboard. Make good. Location 2 - lift carpet, remove section of water damaged floor board (approx L1000mm x W600mm. Replace with treated structural flooring plyboard. Make good.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very pleased with the work undertaken by Steve and his team. Steve contacted me immediately upon posting and arranged for a site visit that very day. Steve and his team were highly professional, knowledgable, responsive and in constant communication throughout the duration of the project which came in on time and on budget. The craftsmanship and attention to detail was excellent and they exceeded our expectations in all aspects. Thank you so much Steve & team!
Work carried out by an employee of the company
Reviewed on 01-06-2023
Partner with Builderscrack
Get work