Published: 10 August 2020
Remove existing kitchen and floating timber floors after water pipe leaked ( plumber has replaced section of pipe already to stop leak ) remove section of Gib, replace damaged insulation, treat previously wet wall framing, remove 4 sheets of damaged particle board flooring, install new Treated ply sheet flooring. Replace areas of water damaged wall and floor insulation. Install two new supplied kitchen cabinets, reinstate existing kitchen cabinets and bench top. Install new skirting to Dinning and Laundry and fit supplied kitchen toe kick boards once floating floors are installed by others
#1 | Tradie 1 | No recent reviews | 28 jobs | No longer in contact |
#2 | Tradie 2 |
|
36 jobs | No longer in contact |
#3 | Tradie 3 |
|
39 jobs | No longer in contact |
Partner with Builderscrack
Get work