Published: 8 March 2018
Our deck was done in 1998 but didn't get resource consent completed at the time and now needs modifications to come up to code. Specific issues are: * Missing mechanical fixings * Decayed timber * Loose barrier * No stair handrail * Non-compliant stairs * Deck joist span is larger than maximum span specified
#1 | Tradie 1 | No recent reviews | 2 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 29 jobs | No longer in contact |
#3 | Tradie 3 |
|
24 jobs | No longer in contact |
Partner with Builderscrack
Get work