Published: 22 August 2017
Demolition of chimney and quite a large fireplace on single storey dwelling. Patch colorsteel roof, installing roof/ceiling, wall and floor framing in void left by fireplace. Gib and stop wall and patch timber floor is possible (not essential). Salvage existing scotia and skirting to be re-fixed. Length of new wall required approx 1600mm, ceiling and floor make good approx 1600x1400mm
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Really happy with everything, good communication, didn't claim any extra costs, work carried out in a reasonable time frame and in a professional manner. Would happily use them again
Work carried out by the owner/operator
Reviewed on 31-10-2017
Tradesperson reply
"Thanks for the review. We are happy the clients are pleased. Nice people to work for."