Published: 17 March 2015
deck has slumped in one corner 100mm. one footing will need re-piling and propping to make deck level. Deck is 2m above ground so post will be --- min dia and good solid concrete footing required as to not slump again. decking may need re-nailing in slumped area if level deck causes boards to pop out as have been slumped with deck for 6 months. Deck approx. 15m2
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Mike and his team were fantastic. Being an Architect I've dealt with a few builders and was impressed with Mike. His experience showed on our first site meeting where he offered suggestions without adding cost. His team were professional, polite and efficient. Looking forward to getting him back again for future work. Well done guys.
Work carried out by the owner/operator
Reviewed on 31-03-2015
Tradesperson reply
"Wow. Thankyou very much for your awesome feedback. I never new that was your ocupation. We enjoyed the job and acheived the desired results..Thanks. Mike "
Partner with Builderscrack
Get work