Published: 15 May 2022
* replace shadow clad on two sides of the lower story of house * replace roofing on workshop and carport * replace hinges on downstairs timber windows, currently a bit rusty and swollen * small gib repair on roof in downstairs rumpus where a water pipe had to be cut out. Probably a couple of sheets max. Sorry don’t really have photos but the attached picture shows one of the downstairs windows and shadow clad which is the bottom half.
#1 | Tradie 1 |
|
5 jobs | No longer in contact |
#2 | Tradie 2 |
|
72 jobs | No longer in contact |
#3 | Tradie 3 |
|
29 jobs | No longer in contact |
Partner with Builderscrack
Get work