Published: 29 September 2014
Ihave a deck that is in need of replacement. Present deck will have to be disassembled. The deck is located on a mainly soil base approx.,100 ml above ground.The current decking is Kwila, but we would prefer to replace with a wider Pine deck.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
An excellent job ,attention to detail could not be faulted.
Work carried out by the owner & subcontractors
Reviewed on 14-11-2014
Tradesperson reply
"This was a most enjoyable job. Makes it all for the better working for nice people. Thankyou very much. Have to come up and view the final result, Mike"
Partner with Builderscrack
Get work