Published: 10 January 2020
First floor deck have five metal support poles that are rusting and require replacement, either with new metal poles or H5 timber poles. Some concrete cutting may be required. Also interested in discussing options to extend the deck.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great communication from Tim, before and during the job. Completed in time he said it would be. Happy with the result.
Work carried out by the owner/operator
Reviewed on 06-02-2020
Partner with Builderscrack
Get work