Published: 13 April 2018
bathroom: wood floor under vinyl got affected due to water leakage. so we need to lift the vinyl and replace the floor board approximate 8.5 m2 floor and then put back the new vinyl or the same if usable. The bathroom floor have shower lines and toilet. bedroom: this adjescent to toilet room and the floor wood got affected. so we may have to replace 1 sheet of floor wood. This bedroom floor has carpet.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
The work completed as per quoted price and scheduled time.
Work carried out by the owner/operator
Reviewed on 10-08-2018
Partner with Builderscrack
Get work