Published: 23 August 2017
We have a Deck - approx. 12 sq metres that we require a Slope/ stepping to be done, to enable Rain water to run off. Would require 3 sides of Fibrelite to be removed.
#1 | Tradie 1 |
|
33 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 0 jobs | No longer in contact |
#3 | Tradie 3 |
|
73 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 14 jobs | No longer in contact |
Partner with Builderscrack
Get work