Published: 13 January 2016
We need to have a panel of base board repaired before we do some concreting. The panel is approximately 2500 long by 600 high and has a vent in it. Part of it is behind some pre-existing concrete. Please see attached photos for board material.
Partner with Builderscrack
Get work