We are rennovating the lower floor of our house (two bedrooms and a sunroom). The work requires strip carpet and seal concrete floors, address any dampness, install soundproof gib, install a sink with relevant electrical and plumbing work. We would like to start the work in early March.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
4.0
|
Communications |
4.0
|
Redefine provide high quality work. Some additional work was added to the original script. This had to be scheduled separately and stretched the completion date out.
Work carried out by the owner/operator