Published on 11 November 2024
We had a pipe leak, and a longish section of the old leaking pipe was replaced through several holes in the wall. The repair job is for the ENTIRE entrance hall ceiling gib and insulation to be removed and replaced, leaving an edge to preserve the coving. Plus two holes in the wall to be filled, Hole above laundry door to be filled/patched.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Completed work on schedule, maintained good communication throughout, very reliable and responsive. Recommend A+
Work carried out by the owner/operator
Reviewed on 22 November 2024
Partner with Builderscrack
Get work