Published: 27 February 2023
Needing to replace carpet in the near future and I’m looking for someone to break up remove an old concrete fireplace hearth. Then to make it level with the existing particle board floorboard by either new board/concrete/levelling compound? No specific time frame required, can be flexible to suit.
#1 | Tradie 1 |
|
74 jobs | No longer in contact |
#2 | Tradie 2 |
|
38 jobs | No longer in contact |
Partner with Builderscrack
Get work