Published: 26 September 2014
I have a 233m2 "deconstructed house" that I need re-building everything will be on site down to the light fittings..So the slap will need doing and pre-plumbing etc.. The attached garage will be a rumpus room and the will be an external to build too.
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 | No recent reviews | 65 jobs | No longer in contact |
#3 | Tradie 3 |
|
87 jobs | No longer in contact |
#4 | Tradie 4 |
|
11 jobs | No longer in contact |
Partner with Builderscrack
Get work