Install +/- 6.1m x 250 PFC beam alongside existing as indicated in attached drawing Remove existing coat closet as indicated Remove existing laminate floor and tile to form entrance hearth Install client-approved log-burner fire c/w fixtures, fittings and flashings as appropriate by design Relocate existing light switch(es) to external wall. Retain existing ceilings, box around new beam and make good Site to be maintained in a safe, secure, clean and tidy condition at all times. Contractor responsible for removal and disposition of all waste All works to be conducted between --- weekdays only unless with the prior approval of the client
Workmanship |
5.0
|
John and all his team were prompt, polite, discreet and a joy to work with. I can't recommend them enough and won't hesitate to engage JdK for any future works.
Reviewed on 25-08-2009
Tradesperson reply
"A great job where everyone worked together to maintain progress schedule. A pleasure working for these clients."