We currently have a separate bathroom/toilet that we are wanting to combine into one room and modernise. We need a wall removed, a door blocked off and a complete re-fit of the bathroom fittings (shower over bath, vanity, toilet) and fixtures, including tiling, new aqua-line gib, lighting and plumbing, which will need to be moved. The size of the bathroom (when combined) will be about 5m2. There is also a small section of rot on the outside wall and possibly under the bath which will need replacing with new wood. We have completed a price estimate on Builders Crack, which estimated it could cost between $4,000-$8,000 dollars. If we could achieve this, that would be ideal but we are flexible.


Review

Workmanship
4.0
Cost
5.0
Schedule
4.0
Communications
4.5

As with most jobs, this one had a few unexpected costs and changes, which blew out times lines and budgets. But the communication from Luke was great. We were kept well informed of any changes that needed to be made, and were given updated costs. We are very happy with the end result.

Work carried out by a subcontractor
Reviewed on 6 June 2011

Tradesperson reply
"Thanks Alex and Lisa, great clients"