Review

Deck reinstating on weatherboards

Job image

Job description

Decking & Pergolas
Maraetai, Manukau

Published on 8 January 2025

Hi there, We recently re-clad part of the house and the deck fixing to the house was removed. There is about 15m of decking (36 joists) that needs to be connected back to the house as per code for council inspection. There is a possibility for additional work to increase the deck size as per consent at a later stage. Thanks Jerry


Review

Workmanship
5.0
Cost
4.0
Schedule
5.0
Communications
5.0

Many Thanks Ash for completing the work. We are so please with the final results and how it turned out. Great comms and great work Looking forward to working with you again in the future

Work carried out by the owner/operator
Reviewed on 3 February 2025

Verified Builderscrack review