Take off old and put new sheets on. I am keeping stainless steel floor. I am having a plumber to put new shower in and increase pressure of shower as low pressure hot water cylinder. Shower door is new as just done recently
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great guy to deal with too Excellent workmanship Not one drama Highly recommend this onto it builder
Work carried out by the owner/operator
Reviewed on 15-12-2022
Partner with Builderscrack
Get work