Review

Drainage Drain-flow work (house exterior wall)

Job image

Job description

Other (Building)
Hutt Valley

Published on 12 September 2009

The job is to dig up a length of approx 10 m of gravel and soil beside an exterior house wall. The concrete wall will then need to be sealed and p10 type gravel replaced and drain flow laid. There is already a spouting drain to run the pipe into at the bottom. I'm estimating a 2-3 day labour component and you will need to supply the concrete sealer to coat an area 8 metres x 1.5 metres + the drainlow. You will need to leave the area clean and tidy (how you found it). There is also a small area 1m x 5m that will require concrete.


Review

Workmanship
5.0

Very well done and completed work as promised.

Reviewed on 16 October 2009

Verified Builderscrack review

Trade professionals

#1
Tradie 1
unrated
2 jobs
Secured job
#2
Tradie 2
unrated
2 jobs
No longer in contact
#3
Tradie 3
unrated
0 jobs
No longer in contact
#4
Tradie 4
91 jobs
No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo