Review

Install new cladding to seal underfloor insulation

Job image

Job description

New Cladding
Clifton, Christchurch

Published on 8 May 2024

Last year new insulation was installed and nicely sealed off with ply and seal tape on lowest level (maintaining existing pipe hangars refer example pictures). Our builder is no longer doing business so we are looking for someone to do a similar job and seal new installed insulation on our second level with materials possibly being: Plybrace 7mm --- tape sealing ecoply 60mm x 30M screws deck 8g x 40mm 500pk. Please refer images below of example of finished lowest level and picture of current new insulation on second level requiring sealing off.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

Filos & Roy did great work sealing our underfloor insulation. Timely, communicative, personable, quality work, and delivered to budget. We'll be using them for the level 2 underfloor next! Highly recommend.

Work carried out by the owner/operator
Reviewed on 26 May 2024

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo