A deteriorating sleepout needs to be demolished and removed. A new one needs to be erected.
Workmanship |
2.0
|
Cost |
2.0
|
Schedule |
1.0
|
Communications |
2.0
|
50% was paid on 20 January and barely any work carried out.10 weeks later we have building rubbish from demolition still on our lawn and no building and no communication about the future of the job. A very bad experience and out of pocket for the deposit.
Work carried out by the owner/operator
Reviewed on 04-04-2014