Posted 4 years ago
Garage Foundations - Blockwork
Blockwork
Titirangi, Waitakere
We are building a garage 13m x 7m. The back of the garage (13m wide) will be 6 courses, the front will be 3 courses, with the sides stepping up evenly a course at a time. --- blocks with a header block.
Footings are currently dug, and we're aiming to have the footings poured pre-xmas. Would like to get into the block work ASAP, so hoping someone might be happy to work over the break?
All blocks and mortar will be onsite (electric concrete mixer is also here if needed), so really just la...