Published on 3 July 2024
In my subfloor workshop I need the reinforcing rods stood up (currently bent over) and 2 rows of concrete blocks laid. About 5m total. Photo 1 and 2 show the area and photo 3 is the other side which is what I am looking for
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very happy with Gary’s workmanship and communication. Would totally recommend
Work carried out by the owner/operator
Reviewed on 29 July 2024
Partner with Builderscrack
Get work