Published: 3 May 2018
Looking to pave front courtyard, 3 m x 3 m , from existing uneven poor turf. Not time sensitive, but need it to be strong and level when finished. Was thinking brick but could be up for discussion. 3m wide drive to my group of Units.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 14-06-2018
Partner with Builderscrack
Get work