Posted 4 days ago
Bathroom & Toilet
Interior Painting
Howick, Manukau
We are in the final stages of a bathroom and seperate toiler refresh.
We have new vanity, bath, plumbing, floor tiles in place, but need existing tiled walls (bathroom) and 1/2 tiled, 1/2 gib walls (toilet) painted to complete the refresh. Tiles will need some filling in certain places as the refresh has left some holes. Rooms will need the new fittings covered and the floor before painting.
Bathroom and Toilet shown prior to new installs completed.