Posted 5 years ago
Bathroom reno
Bathroom Renovation
Lower Hutt, Hutt Valley
I need two bathrooms to be prepared for tiling and after tiling I will need new vanities put in. Current shower box, toilet, floor vinal, vanity and splash-back tiles needs to be removed. after the tiling is done a new vanity and toilet will need to be intalled. the floor area in bathroom one about 12m and bathroom two is about 10m.
The preparation/demolition work needs to done with the next two weeks. The installation part will have to be done after the tiling is finished which will take rough...