Project

Watts and Hughes

Excavating for new footings
Excavating for new footings
Remove existing wall
Remove existing wall
Steel work
Steel work
Pouring concrete
Pouring concrete
Pumping in concrete
Pumping in concrete
Concrete laid for overflow path
Concrete laid for overflow path
Exposed aggregate 10mm with black oxide
Exposed aggregate 10mm with black oxide
The carpentry work begins on top of our work
The carpentry work begins on top of our work

Project description

Demolition of existing wall,excavation for overflow and overland path.

Last updated on 14-05-2024