Project

Plastering job

Hole in the wall

Hole in the wall

Coverd with the GIB  board.

Coverd with the GIB board.

Plastering done

Plastering done

Undercoat the damaged area

Undercoat the damaged area

Final outcome

Final outcome

Project description

The objective was to mend the hole created by the plumber for inspecting a water leakage inside. The plastering work was done carefully, making sure not to harm the cables and water pipes in the background. The wall looks perfect now, and you can hardly tell there was any damage before.

Last updated on 16-04-2024