Project

Bathroom Renovation - Cath

Completed Bathroom pre paint
Completed Bathroom pre paint
Installed Frameless Glass Shower
Installed Frameless Glass Shower
Restored floors
Restored floors
Wall Hung Vanity
Wall Hung Vanity
Original bathroom tiled
Original bathroom tiled
Shower out
Shower out
Fully gutted ready for lining
Fully gutted ready for lining

Project description

The client had an upstairs bathroom, the shower was leaking and she was seeking quotes to replace the shower. It was a 1990's house, client decided to replace all fittings and reline the bathroom to code as well as insulating between the bedroom and bathroom wall. The existing floor was tiled and when removed showed a beautiful wooden floor which we had restored. Client was plastering and painting there selves.

Last updated on 07-04-2024