Project

7 Reserve tce Lyttelton

ensuite
ensuite
bathroom
bathroom
hallway flooring
hallway flooring
kichen flooring
kichen flooring
lounge flooring/leveled floor
lounge flooring/leveled floor
retaining wall
retaining wall
retaining wall
retaining wall
kKwila deck with enclosure
kKwila deck with enclosure
Kwila deck
Kwila deck
Kwila deck entrance area
Kwila deck entrance area
constructed stairs
constructed stairs
kwila deck to garage entrance
kwila deck to garage entrance

Project description

renovations and decking, re-level flooring , over lay floor with new panel flooring, install vanities and showers to ensuite and bathroom, remove and rehang doors, install skirting and lift garage entrance and re joist and in stall kwila decking to entrance and 3 other decking areas. Install retaining wall.

Last updated on 25-03-2024