Strip grass and excavate and remove 200mm topsoil.
Prep ground and lay geotextile cloth to reduce base shrinkage.
Prep and level base with compacted gravel.
Installing paving mats.
Install complete, now to fill level and compact.
Finished project.
Excavate 200mm and lay 60m2 approx of permeable paving, filling 80% with topsoil for grass and 20% with gravel for parking areas.