Project

Removal of class A asbestos tiles and floor.

Getting started with the preparation of removal.

Getting started with the preparation of removal.

Using black poly plastic to contain the contaminated floor with asbestos tiles to be removed.

Using black poly plastic to contain the contaminated floor with asbestos tiles to be removed.

Using black poly plastic to contain the contaminated floor with asbestos tiles to be removed.

Using black poly plastic to contain the contaminated floor with asbestos tiles to be removed.

Signs put up to warn people to stay away from the area.

Signs put up to warn people to stay away from the area.

Using black poly plastic and signs to warn people to stay away from the backdoor.

Using black poly plastic and signs to warn people to stay away from the backdoor.

Signs and 3 stage decon ready for removal.

Signs and 3 stage decon ready for removal.

Removal of asbestos floor tiles.

Removal of asbestos floor tiles.

Removal of asbestos floor tiles.

Removal of asbestos floor tiles.

Use vaccum for clean up and NPU filter for air flow system.

Use vaccum for clean up and NPU filter for air flow system.

Using NPU system for air flow.

Using NPU system for air flow.

Vaccum and rags used for clean up.

Vaccum and rags used for clean up.

Project description

Had to removed the tiles and scrape the floor contaminated with asbestos.

Last updated on 14-06-2023