Overview
Many sites of Beach Road boast a great Seaview being on higher ground. That also means the site is heavily sloped with large engineering foundation structure. This posed a significant compliance issue when our client bought this house for complete renovation and re-cladding.
The site and the building had some tricky issues. The building did not have CCC due to the private certifier gone burst at the time of the original build. To further complicate the issues, PS4 for structural and Geotech was not obtained at the time. As the structure and Geotech part of the building is such a major part of the construction, they are usually not easy to rectify if there is a problem.
Solution
THE DESIGNFIRE tackled this issue with working with our close working geotechnical and structural engineers to a successful resolution.
The old house design reflected the favoured design language of that era – fake masonry look, use of parapets. Re-design options for the exterior of the house were explored firstly to reduce the weather-tightness risk secondly to modernise the property to update to current trends.
Another main issue was that due to the existing building height over three storey on a steel site. Design options were limited due to that the existing house already very close to the maximum height limit of the site. A very careful concept and detailing approach was required to ensure the house is weathertight, and it also looks highly modern.
THE DESIGNFIRE managed to obtain CCC for both the new structure as well as existing structure successfully.
In Detail
Because THE DESIGNFIRE completed such many re-cladding projects in recent years in a highly competent manner, the council officers themselves recommended THE DESIGNFIRE to our client to tackling these re-cladding projects.