Project

200m Driveway Clearing & Gabion Rock Silt Drains - Swanson.

BEFORE

BEFORE

BEFORE

BEFORE

BEFORE

BEFORE

Removal

Removal

Removal

Removal

Gabion Silt Drain

Gabion Silt Drain

Onsite Tipsite

Onsite Tipsite

Gabion Silt Drain

Gabion Silt Drain

Importing Rocks

Importing Rocks

Clean & Tidy Site

Clean & Tidy Site

Clean & Tidy Site

Clean & Tidy Site

Clean & Tidy Site

Clean & Tidy Site

Clean & Tidy Site

Clean & Tidy Site

Tipsite Location

Tipsite Location

BEFORE

BEFORE

Project description

Price Projects succesfully completed a project involving the clearing of Agapanthus on a 100m long concrete driveway, which had become overgrown and unsightly over the years. Our team accomplished the following tasks to transform the site:

- Created an onsite tiphead to save the client tipping fees
- Cut new Watertables to redirect water flow and reduce mud flow on the driveway
- Installed subsoil drains around the house
- Buried an old bathtub
- Cleared blackberry bushes and vegetation in the paddocks
- Imported a small amount of Gabion Rocks to tidy up the entrance ways and existing retaining wall
- Completed a chemical waterblast of the entire site and driveway on exit, resulting in a clean and tidy finish.

The project was executed on "charge up," and we provided regular updates to the client for budget tracking.

At Price Projects, we are committed to providing our clients with customized solutions, exceptional quality of work, and transparent communication.

Contact us today to discuss your next project!

Last updated on 24-05-2023