Project description

This project involved the design and installation of an integrated linear handrail system spanning over 500 meters across a significant slope. The primary objective was to overcome substantial elevation changes and grade variations to achieve a continuous, straight, and perfectly level top rail, providing a consistent visual datum and safety guide.

Last updated on 29-08-2025