Project

Exterior front entrance tidy up

Perparation .,All Painted surfaces to be processed was made sound . Bare timber was wood primed ,undercoated , and twofull top coats
Perparation .,All Painted surfaces to be processed was made sound . Bare timber was wood primed ,undercoated , and twofull top coats
This job required two vist as products used needed 24hrs before been processed.
This job required two vist as products used needed 24hrs before been processed.
Pigment sealed ,and two full top coat
Pigment sealed ,and two full top coat

Project description

Repaint front door entrance , wooden door and repair rotten step over with two pot fuller. Brick wall needed oil pig sealer and two top coats. A few black panels needed repainting

Last updated on 01-05-2025