Puhinui Interchange

Prepping and laying mesh and pouring ready for the hot mix on the next couple of days at CRL Railing C2

Prepping and laying mesh and pouring ready for the hot mix on the next couple of days at CRL Railing C2

Installed these precast stairs at Epsom Health Care sub contract to Nailor Love, not only that we build doka Shutters 9 meters long along the wall and all the concrete work on site (Slab,Wall,grout,) and installed all the flat slab on site.

Installed these precast stairs at Epsom Health Care sub contract to Nailor Love, not only that we build doka Shutters 9 meters long along the wall and all the concrete work on site (Slab,Wall,grout,) and installed all the flat slab on site.

Formwork and helping out the pouring 40 cubes sub contract to Nailor Love, Project name: high school. At northcote and installed all precast panel and the flat slab and other cranes lifted

Formwork and helping out the pouring 40 cubes sub contract to Nailor Love, Project name: high school. At northcote and installed all precast panel and the flat slab and other cranes lifted

I was responsible for the lifts on site installed all those 3 different buildings from level 1 to 4 (precast panel, flat slab)  Apartment at Te Atatū South sub contract to KBS

I was responsible for the lifts on site installed all those 3 different buildings from level 1 to 4 (precast panel, flat slab) Apartment at Te Atatū South sub contract to KBS

Project description

I did most of the form work on this project and poured it and some of the crane work like rigging installed those beam on the rail way and other different lifts.

Last updated on 04-11-2024