Prepping and laying mesh and pouring ready for the hot mix on the next couple of days at CRL Railing C2
Installed these precast stairs at Epsom Health Care sub contract to Nailor Love, not only that we build doka Shutters 9 meters long along the wall and all the concrete work on site (Slab,Wall,grout,) and installed all the flat slab on site.
Formwork and helping out the pouring 40 cubes sub contract to Nailor Love, Project name: high school. At northcote and installed all precast panel and the flat slab and other cranes lifted
I was responsible for the lifts on site installed all those 3 different buildings from level 1 to 4 (precast panel, flat slab) Apartment at Te Atatū South sub contract to KBS