Published: 29 December 2022
We need hot-mop tar applied to a covered deck area prior to tiling. The area is 1.4m wide x 6.2m long and will be covered in marine ply with flashing along edges. The idea is to make it waterproof like a shower pan.
Partner with Builderscrack
Get work