We need to water proof our bathroom shower and floor. We're building an alcove shower and don't want a shower door so will need to waterproof 1500mm out in all directions from the shower slide. You will see in the photos we don't have GIB up in the bathroom yet but will have this area gibed over the next two weeks. The builder is also building the shower base in that period too.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Ebi was great. Exceeded expectations. He was prompt on follow up and communicating the expectations on the project. I'd highly recommend him for you waterproofing job.
Work carried out by the owner/operator
Reviewed on 15-08-2016
Partner with Builderscrack
Get work