In the building report for our property, four windows were highlighted as having high moisture levels surrounding them. All four windows have aluminium joinery with rubber seals having eroded away as well as the seal between concrete sill and frame having eroded in places. Prospective buyers have requested this be fixed by settlement date which is six weeks from the 10th of March.
#1 | Tradie 1 |
|
248 jobs | No longer in contact |
#2 | Tradie 2 |
|
28 jobs | No longer in contact |
#3 | Tradie 3 |
|
88 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work