As per building report: Investigations to assess the level of moisture penetration damage and ascertain the cause/s prior to completing all remedial work to a satisfactory conclusion. The window appears to have been already removed and reinstated at some stage. Removal and the installation of a suitable full depth mechanical sill flashing will be required. Inferior detailing and reinstatement best practices are noted.
#1 | Tradie 1 | No recent reviews | 0 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 27 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 207 jobs | No longer in contact |
Partner with Builderscrack
Get work