Our new kitchen is currently being installed, and we have been advised that waterproofing our particleboard sub floor prior to laying laminate may be required as part of consent. Waterproofing is required 1.5M from dishwasher and sink.
#1 | Tradie 1 |
|
22 jobs | No longer in contact |
#2 | Tradie 2 |
|
5 jobs | No longer in contact |
#3 | Tradie 3 |
|
111 jobs | No longer in contact |
#4 | Tradie 4 |
|
7 jobs | No longer in contact |
Partner with Builderscrack
Get work