Area required: 56.505 sqm. Rental property was assessed as non-compliant and requires a Ground Moisture Barrier to be installed, by a professional installer, in the sub floor space that meets the specifications in NZS --- or have a vapor flow resistance of at least 50MNs/g.
#1 | Tradie 1 |
|
34 jobs | No longer in contact |
#2 | Tradie 2 |
|
19 jobs | No longer in contact |
Partner with Builderscrack
Get work