Published: 4 October 2024
New second storey deck joists have been installed and requires waterproofing membrane over a new ply base before the floating decking gets installed over the top. Trade must be familar with Viking Enviroclad TPO system.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Giovani was great to work with, good communication and did exactly what they quoted. They completed the job in a morning. Happy to recommend him to anyone looking at doing a waterproofing job.
Work carried out by the owner/operator
Reviewed on 11-10-2024
Partner with Builderscrack
Get work