Review

Bargeboard Replacement

Job image
Job image
Job image

Job description

Exterior Waterproofing
Christchurch

Hey! I'd like to get my right hand side barge board replaced. It has rotted and warped and is no longer watertight, so it needs to be replaced. It used to have mains power running into it, but that now goes through the other side. May need a flashing or something to cover the top too? I haven't measured it, but my guess would be 3-4m. This would require someone to measure and purchase materials, install and seal. No need to paint as I can do that, but pre-primed bargeboard would be preferred. Thanks


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo