Bathroom is ready for waterproofing. The shower over bath is a free standing corner bath that has a 15mm upstand so it can be inset into the GIB. Walls around shower over bath will be floor to ceiling tiles. Bathroom is roughly 2.1x2.1m and we would like the floor waterproofed as well as around the walls of the bath to meet building code please. Photos attached showing where the bath will be and with it temporarily installed. The plan is to tile the whole floor then put the freestanding bath on top of floor tiles and inset into the GIB then tile down to top of bath.
#1 | Tradie 1 |
|
79 jobs | No longer in contact |
#2 | Tradie 2 |
|
59 jobs | No longer in contact |
#3 | Tradie 3 |
|
5 jobs | No longer in contact |
#4 | Tradie 4 |
|
36 jobs | No longer in contact |
#5 | Tradie 5 |
|
7 jobs | No longer in contact |
#6 | Tradie 6 |
|
157 jobs | No longer in contact |
#7 | Tradie 7 |
|
65 jobs | No longer in contact |
#8 | Tradie 8 |
|
2 jobs | No longer in contact |
Partner with Builderscrack
Get work